Load sharing panel board

Load sharing panel board

Load sharing panel board

The load share units continuously monitor the load and during low demand periods one or two generators will be shut down to save on fuel consumption.
As demand rises again the second generator and third generator will be restarted, synchronized and reconnected to the load. When the AMF control unit detects that the main supply has been restored an adjustable observation period is activated before the main supply is reconnected. A cool down period will then follow, after which the generator sets will be shut down.